影影分析电影数据实验室
Lake of Betrayal: The Story of Kinzua Dam 2017 电影海报
数据看片

Lake of Betrayal: The Story of Kinzua Dam

201756 分钟

Kinzua Dam on the Allegheny River in Pennsylvania was a flashpoint in history for the Seneca Nation of Indians. Completed in 1965, the dam was to mitigate flooding in Pittsburgh, 198 miles downriver, but the 27-mile reservoir that formed above it inundated vast tracts of the Seneca Indians' ancestral lands, forcing their removal in breach of one of the United States' oldest treaties. Set against a backdrop of a federal Indian termination policy, pork-barrel politics, and undisclosed plans for private hydropower, Lake of Betrayal reveals an untold story from American history-a one-sided battle pitting a small Native American nation against some of the strongest political, social, and commercial forces in the country. Although the Seneca suffered irreplaceable cultural losses, the Kinzua crisis became a turning point to build a stronger Seneca Nation.

站内评分—
IMDb—
豆瓣—
浏览热度0
QUICK FACTS

《Lake of Betrayal: The Story of Kinzua Dam》快速了解

在影分析查看《Lake of Betrayal: The Story of Kinzua Dam》:2017年 · 56分钟。数据看片视角整理剧情、评分、片长与相关推荐。

上映年份2017
片长56 分钟
语言en

影分析 的整理视角

本站以“数据看片”为主要发现入口。用评分、热度和票房数据帮你判断一部片值不值得看。 本页把影片的上映信息、片长、评分、剧情与相关推荐集中到一个页面,方便继续检索和比较。

常见问题

《Lake of Betrayal: The Story of Kinzua Dam》是哪一年的电影?

《Lake of Betrayal: The Story of Kinzua Dam》的上映年份为2017年。

《Lake of Betrayal: The Story of Kinzua Dam》片长多少?

当前资料显示《Lake of Betrayal: The Story of Kinzua Dam》片长约56分钟。

《Lake of Betrayal: The Story of Kinzua Dam》主要是什么语言?

当前资料显示《Lake of Betrayal: The Story of Kinzua Dam》的语言信息为en。

PEOPLE

从人物继续发现

查看本片相关演员或导演的其他电影作品。

数据看片

热门正在升温

按热度发现近期被频繁查看的电影

查看更多 →
SEARCH DISCOVERY

电影数据实验室

全部专题评分榜热度榜票房榜新片数据剧情数据动作数据喜剧数据科幻数据惊悚数据